Guides

Index of WUC Guides Subcommittee 2 – Engineering
Guide Number Revision Last Revision Date Title
DEV Jul-04 WESTERN UNDERGROUND GUIDELINE DEVELOPMENT
FOR Jul-04 WUC JOINT USE FORMULA GUIDELINE
1.1 0 Aug-68 Maintenance and Extensions to Existing Joint Trench Systems.
1.2 Guide Withdrawn Operating Requirements for 200 Amp Separable Connectors
1.3 Not Issued Instruction for Minimizing Mosquito Production in Ventilated Underground Transformer Enclosures – (Guide not approved/issued)
1.4 0 Jan-80 Non-returnable Wood Cable Reels
2.1 Replaced Single Phase Padmount Transformers – (1967, Replaced by ANSI C57.12.22 and C57.12.25)
2.2 Replaced Three Phase Padmount Transformers – (1967, Replaced by ANSI C57.12.22 and C57.12.26)
2.3 1 Aug-68 Single Phase Subsurface URD Transformers – (Replaced by ANSI C57.12.23).
2.4 1 Feb-68 Heat Shrinkable Splice Tubing
2.5 1 Jul-04 Submersible Low Voltage Connector Systems
2.6 0 Aug-68 Three Phase Subsurface Underground Commercial Distribution (URD) Transformers
2.7 0 Mar-70 Submersible Capacitor Equipments
2.8 0 Jun-68 Three Phase Subsurface Transformers – (Guide not approved/issued)
2.9 0 Jun-71 Separable Insulated Connectors – (Guide Not approved/issued)
2.10 1 Sep-82 Line Fault Indicators
2.11 1 Jul-90 Application Guide for Fault Indicators
2.12A 1 Jan-94 Padmount Three Phase Live Front Capacitor Banks
2.12B 1 Jan-94 Padmount Three Phase Dead Front Capacitor Banks
2.13 4 Feb-79 Cabinet Security for Padmount Equipment
2.14 1 Sep-90 Abrasion Resistant 600 Volt Cable
2.15 0 May-88 Flat Single Phase Transformer Pads
3.1 1 May-73 Plastic Conduit and Fittings
3.2 Not Issued Joint Power and Communication Pedestal
3.3 1 Aug-67 Precast Concrete Boxes, Handholes, Manholes and Vaults
3.4 0 May-65 Plastic Conduit and Fittings Placing Instructions
3.5 0 Feb-70 Subsurface Transformer Enclosures
3.6 2 May-88 Non Concrete Handholes
3.7 0 May-77 High Density Polyethylene Conduit and Fittings